The Rios Group, Inc. (TRG) performed QLB and QLA SUE services for this San Antonio Water System project to replace approx. 19,000 LF of the existing 54-inch gravity sanitary sewer main with approximately 2,250 LF of a large diameter (60-inch) sewer installation and the installation of 26,750 LF of a large diameter (90-inch) sewer. TRG performed QLB SUE services by designating existing underground utilities within a 100’ radius of each of the ten proposed shaft sites. The scope also included mapping utilities within the proposed open-cut areas. TRG excavated approximately 80 QLA SUE test holes to locate the vertical and horizontal positions of existing utilities at potential conflict locations.

  • Year2020
  • RegionCentral Texas
  • LocationSan Antonio, Texas
  • SectorMunicipality
  • Service TypeSUE
Contact Us

For general information or to discuss a request for proposal, please complete the form below and we will be in touch within 24 hours. Thanks for your interest.

For general information or to discuss a request for proposal, please complete the form below and we will be in touch within 24 hours. Thanks for your interest.