Project Overview

TRG performed QLB through QLD Subsurface Utility Engineering Services on this municipal roadway project for the City of Fort Worth in support of the prime firm, Graham and Associates. This project was for the design and construction of WJ Boaz Road between Boat Club Road and Elkins School Road and included the proposed reconstruction of approximately 1.13 miles of existing 2 lane roadway to a 4-lane divided thoroughfare street section. TRG has currently performed QLB throughout the length of the project limits. The final deliverable consisted of a comprehensive utility file in CADD format depicting locations of the designated utilities (16” waterline, gas and ATT) an aerial, overhead inventory.

  • Year2022
  • RegionNorth Texas
  • LocationFort Worth, Texas
  • SectorRoadway Municipal
  • Service TypeSUE
Contact Us

For general information or to discuss a request for proposal, please complete the form below and we will be in touch within 24 hours. Thanks for your interest.

For general information or to discuss a request for proposal, please complete the form below and we will be in touch within 24 hours. Thanks for your interest.